Iulian:
Our PVDF system is predominantly welded with occasional unions where
needed. The original part of our system was installed sufficiently long
ago, that I believe the only choice at that time was the Georg Fischer
socket fused connections. Since that time we have had a few segments
added ... a bit as recently as a couple of months ago. For that we have
used the butt-welded fusion fittings (rather than socket fused joints)
... with occasional butt-welded unions where required for easy assembly
and/or disassembly.
I hope that helps and, as usual, I will be looking to see what other
folks have done.
Good luck,
John
On 7/5/2012 5:33 AM, Iulian Codreanu wrote:
> Good Morning.
>
> We are trying to determine how to best join long runs of PVDF pipe on
> our ultrapure water system (we are trying to achieve Type E-1.1 per
> ASTM D5127). We are aware of the following methods:
> - fully welded system
> - systems using flanges
> - systems using unions
> - systems using GF sanitary couplings with clamps
>
> Knowing how other University Fabs do it would be very helpful in
> making a decision (affecting water quality, cost, and schedule) and
> thus your input will be much appreciated.
>