[labnetwork] Jupiter Callisto abatement system N2 usage
Joseph Losby
joseph.losby at ucalgary.ca
Fri Sep 15 13:33:22 EDT 2023
Hi everyone,
According to Critical Systems inc., 18 CFM (7 CFM emergency purge, 3 CFM normal purge, 8 CFM venturi pump) of N2 should be allocated to the Jupiter Callisto abatement system. That seems like a lot to allocate to one piece of equipment. Do any of you have any experience with them, and is this N2 usage realistic? Is there a situation where the normal and emergency purges kick in at the same time?
Cheers,
Joe
Joe Losby, PhD
Manager, qLab Operations
[cid:82a07d3a-2d5b-4c9e-8b72-26fd32fb811b]
Quantum City’s qConnect 2023: Connecting quantum creators and users | Join us November 15-17, 2023 in Calgary, Alberta at Telus Convention Centre. Click here for more information.<https://research.ucalgary.ca/quantum-city/quantum-city/quantum-city/q-connect-2023>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mtl.mit.edu/pipermail/labnetwork/attachments/20230915/8c907eb2/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Outlook-c10sqgnr.jpg
Type: image/jpeg
Size: 13901 bytes
Desc: Outlook-c10sqgnr.jpg
URL: <https://mtl.mit.edu/pipermail/labnetwork/attachments/20230915/8c907eb2/attachment.jpg>
More information about the labnetwork
mailing list