[labnetwork] quick tool fit up survey
Ferraguto, Thomas
Thomas_Ferraguto at uml.edu
Wed Feb 13 08:37:45 EST 2013
Colleagues,
We are currently in the midst of our tool fit up for our 4200 square foot clean room.
At UML we pay for engineer stamped tool packages for every tool we are installing in our clean room (i.e. Schematic drawings, floor plan, electrical, plumbing, etc.)
I would greatly appreciate it you could take a few minutes and answer the questions below , (This is in response to the question posed by Capital Planning, as to what other Universities require?)
Note: I'm referring to process equipment (aligners, deposition equipment, e-beam lithography equipment, wet stations etc., that require high power, specialized piping and exhaust).
Just bold or hi-lite the text in your answer. I am also open to any comments or suggestions !
Tool Fit Up Survey
Enter Your Organization
Are stamped engineering drawings for tool installs ?
YES
NO
What documentation is required for tool installs?
Mfg Cut Sheets
Marked up drawings
Local Permits
Other
Are you required to follow prevailing wage guidelines (Union)
YES
NO
Who Coordinates Tool Installations:
Clean room Staff
Facilities
Outside Contractor
Other
Who Performs the installation
Clean room Staff
Facilities
Outside Contractor
Combination
Comments
Best Regards
P.S. I will happily share my findings on request.
Thomas S. Ferraguto
ETIC Nanofabrication Laboratory Director
University of Massachusetts Lowell
1 University Avenue
Lowell MA 01854-5120
978-934-1809 land
617-755-0910 mobile
978-934-1014 fax
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mtl.mit.edu/pipermail/labnetwork/attachments/20130213/8bcbb861/attachment.html>
More information about the labnetwork
mailing list