[labnetwork] Fw: Implementing Lock-out/Logins on AJA Phase II J sputter system
Mark Hofheins
mhofheins at unm.edu
Thu Aug 17 10:02:04 EDT 2017
Mark Hofheins
mhofheins at unm.edu<mailto:mhofheins at unm.edu>
505-710-3527
Micro Electronics Technician
Manufacturing Engineering
University of New Mexico MTTC
800 Bradbury S.E. Suit 235
Albuquerque, New Mexico
87106-4346
________________________________
From: Mark Hofheins
Sent: Thursday, August 17, 2017 7:46 AM
To: labnetwork-bounces at mtl.mit.edu
Subject: Implementing Lock-out/Logins on AJA Phase II J sputter system
Hello all,
We have an AJA Phase II J sputter tool that we need to implement our "Login" system on.
The system allows for a open /closed circuit at 24v or 115v.
Most all of the sputter system is 230v. I do not want to have to power up the computer each time for someone to login and be able to use the tool.
At this point I believe that my best option is to have an electronic valve in the main plasma gas line as all gasses are routed through a single line.
I am looking for suggestions if anyone has a similar system in place on an AJA.
Thank you,
Mark Hofheins
mhofheins at unm.edu<mailto:mhofheins at unm.edu>
505-710-3527
Micro Electronics Technician
Manufacturing Engineering
University of New Mexico MTTC
800 Bradbury S.E. Suit 235
Albuquerque, New Mexico
87106-4346
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mtl.mit.edu/pipermail/labnetwork/attachments/20170817/a5d811ca/attachment.html>
More information about the labnetwork
mailing list